Jinhe HHP

Jinhe the forth hydropower plant is located in Yunnan, a region gathered with race Miao, Yao and Dai, keep 455km far away from Kunming city featured as diversion type and equipped with two 15 MW vertical Pelton turbine generator units, the model is CJA237-L-165/4x16 and put into operation in Oct. 2006. The runner was terribly worn out because there were lots of civil works undertook on upstream area caused heavy sediment in river, the turbine efficiency is significantly reduced, water consumption increased either than before.


Getai started the renovation in 2015 by new designed runner as L-165/4 CJGT003-4x16, the efficiency increased sharply along with vibration reduction, the result is far beyond plant owner’s expectation.