Cizhonghe HHP

Cizhonghe hydropower plant is located on Cizhong river in the territory of Yunnan province with total installed capacity 2x12MW, turbine model CJA475-L-150/2x10.5. After more than one year operation, one of the turbine runner got bucket break off, the serious accident affected the plant benefits badly and an emergent replacement required in hurry.


Getai was invited to upgrade the Pelton turbine in 2016 by new model CJGT003-L-150/2x10.5, after upgrade the rated capacity can be reached even by reducing 10% of the nozzle opening to bring greater economic benefits.